If you are an ACPA member, please contact Eric Ferrebee for editing access to the content of this resource.

Short pages

Jump to: navigation, search

Showing below up to 500 results in range #1 to #500.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. (hist) ‎Formwork ‎[13 bytes]
  2. (hist) ‎Mechanistic-Empirical Design of New and Rehabilitated Pavements (MEPDG) ‎[13 bytes]
  3. (hist) ‎Paving Forms ‎[13 bytes]
  4. (hist) ‎Dowel Bar (Dowelbar) ‎[14 bytes]
  5. (hist) ‎Juice ‎[14 bytes]
  6. (hist) ‎Hessian ‎[15 bytes]
  7. (hist) ‎Layer ‎[15 bytes]
  8. (hist) ‎Gradation ‎[16 bytes]
  9. (hist) ‎Moisture Barrier ‎[16 bytes]
  10. (hist) ‎Heavy Clay ‎[17 bytes]
  11. (hist) ‎Set-Retarding Admixture ‎[17 bytes]
  12. (hist) ‎Water-Gain ‎[17 bytes]
  13. (hist) ‎Asphalt Concrete (AC) ‎[18 bytes]
  14. (hist) ‎Asphalt Concrete Hot Mix (ACHM) ‎[18 bytes]
  15. (hist) ‎Chemical Admixture ‎[18 bytes]
  16. (hist) ‎External Vibrator ‎[18 bytes]
  17. (hist) ‎Form Stakes ‎[18 bytes]
  18. (hist) ‎Hot Mix Asphalt Concrete (HMAC) ‎[18 bytes]
  19. (hist) ‎Lighter Clay ‎[18 bytes]
  20. (hist) ‎Concrete Overlay Construction ‎[18 bytes]
  21. (hist) ‎Concrete Overlays - Miscellaneous Design Details ‎[18 bytes]
  22. (hist) ‎Flush Water ‎[19 bytes]
  23. (hist) ‎Lot ‎[19 bytes]
  24. (hist) ‎Paddle Mixer ‎[19 bytes]
  25. (hist) ‎Blast Furnace Slag ‎[20 bytes]
  26. (hist) ‎Chair ‎[20 bytes]
  27. (hist) ‎Ground-Granulated Blast-Furnace Slag ‎[20 bytes]
  28. (hist) ‎Microsilica ‎[20 bytes]
  29. (hist) ‎Mixing Plant ‎[20 bytes]
  30. (hist) ‎Set-Accelerating Admixture ‎[20 bytes]
  31. (hist) ‎Soil Moisture Suction ‎[20 bytes]
  32. (hist) ‎Transit Mixer ‎[20 bytes]
  33. (hist) ‎Binder ‎[21 bytes]
  34. (hist) ‎Active Crack ‎[22 bytes]
  35. (hist) ‎Mix Design ‎[22 bytes]
  36. (hist) ‎Mixture Design ‎[22 bytes]
  37. (hist) ‎Blended Hydraulic Cement ‎[23 bytes]
  38. (hist) ‎Cement Factor ‎[23 bytes]
  39. (hist) ‎Horizontal Shaft Impact Crusher ‎[23 bytes]
  40. (hist) ‎Hygroscopic Water ‎[23 bytes]
  41. (hist) ‎Plastic Concrete ‎[23 bytes]
  42. (hist) ‎Unreinforced Concrete ‎[23 bytes]
  43. (hist) ‎Vertical Shaft Impact Crusher ‎[23 bytes]
  44. (hist) ‎Paving Machine ‎[24 bytes]
  45. (hist) ‎Sack (of cement) ‎[24 bytes]
  46. (hist) ‎Scoping ‎[24 bytes]
  47. (hist) ‎Solid Volume ‎[24 bytes]
  48. (hist) ‎Surface Water ‎[25 bytes]
  49. (hist) ‎Water Content ‎[25 bytes]
  50. (hist) ‎Control Joint ‎[26 bytes]
  51. (hist) ‎Drainable Subbase ‎[26 bytes]
  52. (hist) ‎Open-Graded Subbase ‎[26 bytes]
  53. (hist) ‎Storage Hopper ‎[26 bytes]
  54. (hist) ‎Dummy Joint ‎[27 bytes]
  55. (hist) ‎Recementing ‎[27 bytes]
  56. (hist) ‎Wire Mesh ‎[27 bytes]
  57. (hist) ‎Yard (of concrete) ‎[27 bytes]
  58. (hist) ‎Cementitious ‎[28 bytes]
  59. (hist) ‎Mud Balls ‎[28 bytes]
  60. (hist) ‎Thermoplastic ‎[28 bytes]
  61. (hist) ‎Drying Shrinkage ‎[29 bytes]
  62. (hist) ‎Granular Subbase ‎[29 bytes]
  63. (hist) ‎Joint Deterioration ‎[29 bytes]
  64. (hist) ‎Pre-Mixed Concrete ‎[29 bytes]
  65. (hist) ‎Type GU Hydraulic Cement ‎[29 bytes]
  66. (hist) ‎Untreated Subbase ‎[29 bytes]
  67. (hist) ‎Spalling ‎[30 bytes]
  68. (hist) ‎New Page ‎[31 bytes]
  69. (hist) ‎Aggregate-Cement Ratio ‎[31 bytes]
  70. (hist) ‎Deformation ‎[31 bytes]
  71. (hist) ‎Dowel Basket ‎[31 bytes]
  72. (hist) ‎Lean Concrete ‎[31 bytes]
  73. (hist) ‎Length Change ‎[31 bytes]
  74. (hist) ‎Muriatic Acid ‎[31 bytes]
  75. (hist) ‎Plain Concrete ‎[31 bytes]
  76. (hist) ‎Agglomeration ‎[32 bytes]
  77. (hist) ‎Neat Cement ‎[32 bytes]
  78. (hist) ‎Pneumatic ‎[32 bytes]
  79. (hist) ‎Load Transfer Restoration (LTR) ‎[33 bytes]
  80. (hist) ‎Thickness ‎[33 bytes]
  81. (hist) ‎Young's Modulus ‎[33 bytes]
  82. (hist) ‎Fibrous Concrete ‎[34 bytes]
  83. (hist) ‎Compression Seal ‎[35 bytes]
  84. (hist) ‎Subsample ‎[35 bytes]
  85. (hist) ‎Mastic ‎[37 bytes]
  86. (hist) ‎Type HE Hydraulic Cement ‎[37 bytes]
  87. (hist) ‎Slump Test ‎[38 bytes]
  88. (hist) ‎Stripping ‎[38 bytes]
  89. (hist) ‎Type LH Hydraulic Cement ‎[39 bytes]
  90. (hist) ‎Drop Hammer ‎[40 bytes]
  91. (hist) ‎Hydraulic Ram ‎[40 bytes]
  92. (hist) ‎Mud ‎[40 bytes]
  93. (hist) ‎Scalper ‎[40 bytes]
  94. (hist) ‎Type HS Hydraulic Cement ‎[40 bytes]
  95. (hist) ‎Unified Soil Classification System ‎[40 bytes]
  96. (hist) ‎Mesh Reinforcement ‎[41 bytes]
  97. (hist) ‎Thermal Resistance ‎[42 bytes]
  98. (hist) ‎Truck Mixer Manufacturers’ Bureau (TMMB) ‎[43 bytes]
  99. (hist) ‎Thermal Expansion ‎[44 bytes]
  100. (hist) ‎Type MH Hydraulic Cement ‎[44 bytes]
  101. (hist) ‎Type MS Hydraulic Cement ‎[44 bytes]
  102. (hist) ‎High Range Water-Reducing Admixture ‎[46 bytes]
  103. (hist) ‎Sealant ‎[46 bytes]
  104. (hist) ‎Sealing Compound ‎[46 bytes]
  105. (hist) ‎Substructure ‎[46 bytes]
  106. (hist) ‎Superplasticizer ‎[46 bytes]
  107. (hist) ‎Thermal Contraction ‎[46 bytes]
  108. (hist) ‎Unit Weight ‎[46 bytes]
  109. (hist) ‎Bush Hammer ‎[47 bytes]
  110. (hist) ‎Free Water ‎[47 bytes]
  111. (hist) ‎Gap-Graded Concrete ‎[47 bytes]
  112. (hist) ‎K-value ‎[47 bytes]
  113. (hist) ‎Butt Joint ‎[48 bytes]
  114. (hist) ‎Scallop ‎[49 bytes]
  115. (hist) ‎Ultimate Strength ‎[49 bytes]
  116. (hist) ‎Abrasion Damage ‎[50 bytes]
  117. (hist) ‎Mineral Admixtures ‎[50 bytes]
  118. (hist) ‎Neat Cement Grout ‎[50 bytes]
  119. (hist) ‎Cast-In-Place ‎[51 bytes]
  120. (hist) ‎Jointing ‎[51 bytes]
  121. (hist) ‎Specimen ‎[51 bytes]
  122. (hist) ‎Area of Steel ‎[52 bytes]
  123. (hist) ‎Kerf ‎[52 bytes]
  124. (hist) ‎Metakaolin ‎[52 bytes]
  125. (hist) ‎Plastic Flow ‎[52 bytes]
  126. (hist) ‎Vitreous ‎[52 bytes]
  127. (hist) ‎Coupler ‎[53 bytes]
  128. (hist) ‎Vitrified ‎[53 bytes]
  129. (hist) ‎Angle Float ‎[55 bytes]
  130. (hist) ‎Batch Plant ‎[55 bytes]
  131. (hist) ‎Bituminous ‎[55 bytes]
  132. (hist) ‎Elastic Deformation ‎[55 bytes]
  133. (hist) ‎Green Concrete ‎[55 bytes]
  134. (hist) ‎Rich Mixture ‎[55 bytes]
  135. (hist) ‎Spacer ‎[55 bytes]
  136. (hist) ‎Thermosetting ‎[55 bytes]
  137. (hist) ‎Discoloration ‎[56 bytes]
  138. (hist) ‎Fiber-Reinforced Concrete ‎[56 bytes]
  139. (hist) ‎Rebar ‎[56 bytes]
  140. (hist) ‎Time of Setting ‎[56 bytes]
  141. (hist) ‎Asphalt-Treated Subbase (ATB) ‎[57 bytes]
  142. (hist) ‎Batch ‎[57 bytes]
  143. (hist) ‎CRC Pavement (CRCP) ‎[57 bytes]
  144. (hist) ‎Extensibility ‎[57 bytes]
  145. (hist) ‎Light Weight Concrete ‎[57 bytes]
  146. (hist) ‎Skid Resistance ‎[57 bytes]
  147. (hist) ‎Type V Cement ‎[57 bytes]
  148. (hist) ‎Vibrated Concrete ‎[57 bytes]
  149. (hist) ‎Coring ‎[58 bytes]
  150. (hist) ‎Steel Trowel Finish ‎[58 bytes]
  151. (hist) ‎Infiltration ‎[59 bytes]
  152. (hist) ‎White Cement ‎[59 bytes]
  153. (hist) ‎Elephant Trunk ‎[60 bytes]
  154. (hist) ‎Gross Vehicle Load ‎[60 bytes]
  155. (hist) ‎Shape Factor ‎[60 bytes]
  156. (hist) ‎Transverse Joint ‎[60 bytes]
  157. (hist) ‎Adiabatic ‎[61 bytes]
  158. (hist) ‎Fatigue ‎[61 bytes]
  159. (hist) ‎Longitudinal Crack ‎[61 bytes]
  160. (hist) ‎Bar ‎[63 bytes]
  161. (hist) ‎Cement Paste ‎[63 bytes]
  162. (hist) ‎Cement-Aggregate Ratio ‎[63 bytes]
  163. (hist) ‎Coefficient of Variation ‎[63 bytes]
  164. (hist) ‎Silicone Sealant ‎[63 bytes]
  165. (hist) ‎Tooling ‎[63 bytes]
  166. (hist) ‎Traprock ‎[63 bytes]
  167. (hist) ‎Contraction ‎[64 bytes]
  168. (hist) ‎High Density Polyurethane (HDP) ‎[64 bytes]
  169. (hist) ‎Toughness ‎[64 bytes]
  170. (hist) ‎Demold ‎[65 bytes]
  171. (hist) ‎Scalping ‎[65 bytes]
  172. (hist) ‎Substrate ‎[65 bytes]
  173. (hist) ‎Acceleration ‎[66 bytes]
  174. (hist) ‎Concrete Pavement Contraction Design (CPCD) ‎[66 bytes]
  175. (hist) ‎Fast-Track ‎[66 bytes]
  176. (hist) ‎Longitudinal Joint ‎[66 bytes]
  177. (hist) ‎Phasing ‎[66 bytes]
  178. (hist) ‎Sand Grout ‎[66 bytes]
  179. (hist) ‎Trial Batch ‎[66 bytes]
  180. (hist) ‎Arrissing Tool ‎[67 bytes]
  181. (hist) ‎Fiber Count ‎[67 bytes]
  182. (hist) ‎Surface Voids ‎[67 bytes]
  183. (hist) ‎Butterfly ‎[68 bytes]
  184. (hist) ‎Dowel Deflection ‎[68 bytes]
  185. (hist) ‎Hardener ‎[68 bytes]
  186. (hist) ‎Hydroplaning ‎[68 bytes]
  187. (hist) ‎Sack Mix ‎[68 bytes]
  188. (hist) ‎Thermal Volume Change ‎[68 bytes]
  189. (hist) ‎Bulking Factor ‎[69 bytes]
  190. (hist) ‎Hooked Bar ‎[69 bytes]
  191. (hist) ‎Line ‎[69 bytes]
  192. (hist) ‎Whitetopping ‎[69 bytes]
  193. (hist) ‎Air-Meter ‎[70 bytes]
  194. (hist) ‎Batch Mixer ‎[70 bytes]
  195. (hist) ‎Cellular Concrete ‎[70 bytes]
  196. (hist) ‎Monolithic ‎[70 bytes]
  197. (hist) ‎Sand Pocket ‎[70 bytes]
  198. (hist) ‎Splitting Tensile Strength ‎[70 bytes]
  199. (hist) ‎Bulk Modulus ‎[71 bytes]
  200. (hist) ‎Capillary Flow ‎[71 bytes]
  201. (hist) ‎Cracking ‎[71 bytes]
  202. (hist) ‎Greenhouse Gas (GHG) ‎[71 bytes]
  203. (hist) ‎Membrane ‎[71 bytes]
  204. (hist) ‎Standard Deviation ‎[71 bytes]
  205. (hist) ‎Deflection ‎[72 bytes]
  206. (hist) ‎Embedment Length ‎[72 bytes]
  207. (hist) ‎Pugmill ‎[72 bytes]
  208. (hist) ‎Trowel Finish ‎[72 bytes]
  209. (hist) ‎Visqueen ‎[72 bytes]
  210. (hist) ‎Combined Aggregate Grading ‎[73 bytes]
  211. (hist) ‎Flow-line ‎[73 bytes]
  212. (hist) ‎Load Transfer Device ‎[73 bytes]
  213. (hist) ‎Pitch ‎[73 bytes]
  214. (hist) ‎Soil ‎[73 bytes]
  215. (hist) ‎Stationary Hopper ‎[73 bytes]
  216. (hist) ‎Transverse Crack ‎[73 bytes]
  217. (hist) ‎Welded-Wire Fabric Reinforcement ‎[73 bytes]
  218. (hist) ‎Dusting ‎[74 bytes]
  219. (hist) ‎Fogging ‎[74 bytes]
  220. (hist) ‎Iron Oxide ‎[74 bytes]
  221. (hist) ‎Autogenous Healing ‎[75 bytes]
  222. (hist) ‎Hardened Concrete ‎[75 bytes]
  223. (hist) ‎Roller Compaction ‎[75 bytes]
  224. (hist) ‎Epoxy-Coated Bar ‎[76 bytes]
  225. (hist) ‎Gradient ‎[76 bytes]
  226. (hist) ‎Grinding Head ‎[76 bytes]
  227. (hist) ‎Normal Cement ‎[76 bytes]
  228. (hist) ‎Paving Train ‎[76 bytes]
  229. (hist) ‎Stenciled Concrete ‎[76 bytes]
  230. (hist) ‎Fracture ‎[77 bytes]
  231. (hist) ‎Joint Shape Factor ‎[77 bytes]
  232. (hist) ‎Weight Batching ‎[77 bytes]
  233. (hist) ‎Wet Sieving ‎[77 bytes]
  234. (hist) ‎Corrosion ‎[78 bytes]
  235. (hist) ‎Lap ‎[78 bytes]
  236. (hist) ‎Offset ‎[78 bytes]
  237. (hist) ‎Portland Cement Association (PCA) ‎[78 bytes]
  238. (hist) ‎Coefficient of Subgrade Friction ‎[79 bytes]
  239. (hist) ‎Edging ‎[79 bytes]
  240. (hist) ‎Float Finish ‎[79 bytes]
  241. (hist) ‎Hydration ‎[79 bytes]
  242. (hist) ‎Joint Depth ‎[79 bytes]
  243. (hist) ‎Mortar ‎[79 bytes]
  244. (hist) ‎Neat Line ‎[79 bytes]
  245. (hist) ‎Calcareous ‎[80 bytes]
  246. (hist) ‎Form Release Agent ‎[80 bytes]
  247. (hist) ‎Water Repellant Coating ‎[80 bytes]
  248. (hist) ‎Wet ‎[80 bytes]
  249. (hist) ‎Blowup ‎[81 bytes]
  250. (hist) ‎Caliche ‎[81 bytes]
  251. (hist) ‎Dehydration ‎[81 bytes]
  252. (hist) ‎Gap-Graded Aggregate ‎[81 bytes]
  253. (hist) ‎Saw Cut ‎[81 bytes]
  254. (hist) ‎Concrete Breaker ‎[82 bytes]
  255. (hist) ‎Pitting ‎[82 bytes]
  256. (hist) ‎Rout ‎[82 bytes]
  257. (hist) ‎Single-Sized Aggregate ‎[82 bytes]
  258. (hist) ‎Capillary Water ‎[83 bytes]
  259. (hist) ‎No-Slump Concrete ‎[83 bytes]
  260. (hist) ‎Slurry ‎[83 bytes]
  261. (hist) ‎Dense-Graded Aggregate ‎[84 bytes]
  262. (hist) ‎Freeze-Thaw Durability ‎[84 bytes]
  263. (hist) ‎Ready-Mixed Concrete ‎[84 bytes]
  264. (hist) ‎Volume Batching ‎[84 bytes]
  265. (hist) ‎Central Mixer ‎[85 bytes]
  266. (hist) ‎Chipping ‎[85 bytes]
  267. (hist) ‎Dowel Bar Retrofit (DBR) ‎[85 bytes]
  268. (hist) ‎Longitudinal Reinforcement ‎[85 bytes]
  269. (hist) ‎Microfiber ‎[85 bytes]
  270. (hist) ‎Neutral Axis ‎[85 bytes]
  271. (hist) ‎Release Agent ‎[85 bytes]
  272. (hist) ‎Rodability ‎[85 bytes]
  273. (hist) ‎Texturing ‎[85 bytes]
  274. (hist) ‎Dense-Graded Subbase ‎[86 bytes]
  275. (hist) ‎Dynamic Load ‎[86 bytes]
  276. (hist) ‎Finish ‎[86 bytes]
  277. (hist) ‎Transportation Research Board (TRB) ‎[86 bytes]
  278. (hist) ‎Construction Loads ‎[87 bytes]
  279. (hist) ‎Continuous Sampling ‎[87 bytes]
  280. (hist) ‎Early Strength ‎[87 bytes]
  281. (hist) ‎Non-Tilting Mixer ‎[87 bytes]
  282. (hist) ‎Creep ‎[88 bytes]
  283. (hist) ‎Design Strength ‎[88 bytes]
  284. (hist) ‎Integral Color ‎[88 bytes]
  285. (hist) ‎National Concrete Pavement Technology Center (CP Tech Center) ‎[88 bytes]
  286. (hist) ‎Uplift Beam ‎[88 bytes]
  287. (hist) ‎Vicat Apparatus ‎[88 bytes]
  288. (hist) ‎Volcanic ‎[88 bytes]
  289. (hist) ‎Finishing Machine ‎[89 bytes]
  290. (hist) ‎Truck Mixed Concrete ‎[89 bytes]
  291. (hist) ‎Epoxy ‎[90 bytes]
  292. (hist) ‎Plain Pavement ‎[90 bytes]
  293. (hist) ‎Plastic Deformation ‎[90 bytes]
  294. (hist) ‎Wet Screening ‎[91 bytes]
  295. (hist) ‎Crack ‎[92 bytes]
  296. (hist) ‎Power Float ‎[92 bytes]
  297. (hist) ‎Sand Streak ‎[92 bytes]
  298. (hist) ‎Stress-Strain Diagram ‎[92 bytes]
  299. (hist) ‎Disincentive ‎[93 bytes]
  300. (hist) ‎Horizontal-Axis Mixer ‎[93 bytes]
  301. (hist) ‎Overlay ‎[93 bytes]
  302. (hist) ‎Self-Consolidating Concrete (SCC) ‎[93 bytes]
  303. (hist) ‎Sulfate Soundess Mass Loss ‎[93 bytes]
  304. (hist) ‎Wood Forms ‎[93 bytes]
  305. (hist) ‎Clinker ‎[94 bytes]
  306. (hist) ‎Core Test ‎[94 bytes]
  307. (hist) ‎Curbface Batter ‎[94 bytes]
  308. (hist) ‎Pour ‎[94 bytes]
  309. (hist) ‎Volumetric Measuring ‎[94 bytes]
  310. (hist) ‎Form Scabbing ‎[95 bytes]
  311. (hist) ‎Mix ‎[95 bytes]
  312. (hist) ‎Dry Mixing ‎[96 bytes]
  313. (hist) ‎Cement-Stabilized Subbase ‎[97 bytes]
  314. (hist) ‎Cubic Yard ‎[97 bytes]
  315. (hist) ‎Non-Air-Entrained Concrete ‎[97 bytes]
  316. (hist) ‎Over-Vibrated ‎[97 bytes]
  317. (hist) ‎Pie Tape ‎[97 bytes]
  318. (hist) ‎Secondary Crusher ‎[97 bytes]
  319. (hist) ‎Surface Vibration ‎[97 bytes]
  320. (hist) ‎Wipe Test ‎[97 bytes]
  321. (hist) ‎Feather Edge ‎[98 bytes]
  322. (hist) ‎Flat Stakes ‎[98 bytes]
  323. (hist) ‎Flatwork ‎[98 bytes]
  324. (hist) ‎Inclined-Axis Mixer ‎[98 bytes]
  325. (hist) ‎Plasticizer ‎[98 bytes]
  326. (hist) ‎Rodding ‎[98 bytes]
  327. (hist) ‎Density (dry) ‎[99 bytes]
  328. (hist) ‎Development Length ‎[99 bytes]
  329. (hist) ‎Fat ‎[99 bytes]
  330. (hist) ‎Shrink-Mixed Concrete ‎[99 bytes]
  331. (hist) ‎Type II and Type IIA Cement ‎[99 bytes]
  332. (hist) ‎Expansion Sleeve ‎[100 bytes]
  333. (hist) ‎Macrofiber ‎[100 bytes]
  334. (hist) ‎Nonevaporable Water ‎[100 bytes]
  335. (hist) ‎Relative Density ‎[100 bytes]
  336. (hist) ‎Sealer ‎[100 bytes]
  337. (hist) ‎Cross Section ‎[101 bytes]
  338. (hist) ‎Department of Transportation (DOT) ‎[101 bytes]
  339. (hist) ‎Dowel Bar Inserter (DBI) ‎[101 bytes]
  340. (hist) ‎Material Safety Data Sheet (MSDS) ‎[101 bytes]
  341. (hist) ‎Stamped Concrete ‎[101 bytes]
  342. (hist) ‎Wearing Course ‎[101 bytes]
  343. (hist) ‎Aggregate ‎[102 bytes]
  344. (hist) ‎Asphalt Cement ‎[102 bytes]
  345. (hist) ‎Faulting ‎[102 bytes]
  346. (hist) ‎Pressure Relief Cut ‎[102 bytes]
  347. (hist) ‎Slab Jacking ‎[102 bytes]
  348. (hist) ‎Tamping Rod ‎[102 bytes]
  349. (hist) ‎Uncontrolled Crack ‎[102 bytes]
  350. (hist) ‎Chemical Bond ‎[103 bytes]
  351. (hist) ‎Ponding ‎[103 bytes]
  352. (hist) ‎Primary Crusher ‎[103 bytes]
  353. (hist) ‎Screeding ‎[103 bytes]
  354. (hist) ‎Air-Entraining Cement ‎[104 bytes]
  355. (hist) ‎Backfill ‎[104 bytes]
  356. (hist) ‎Caulk ‎[104 bytes]
  357. (hist) ‎Contract ‎[104 bytes]
  358. (hist) ‎Darby ‎[104 bytes]
  359. (hist) ‎Exposed Concrete ‎[104 bytes]
  360. (hist) ‎Grout-Retention Disk ‎[104 bytes]
  361. (hist) ‎Harsh Mixture ‎[104 bytes]
  362. (hist) ‎Isotropic ‎[104 bytes]
  363. (hist) ‎Kneeboards ‎[104 bytes]
  364. (hist) ‎Natural Aggregate ‎[104 bytes]
  365. (hist) ‎Unsound ‎[104 bytes]
  366. (hist) ‎Ductility ‎[105 bytes]
  367. (hist) ‎Key ‎[105 bytes]
  368. (hist) ‎Pea Gravel ‎[105 bytes]
  369. (hist) ‎Random Crack ‎[105 bytes]
  370. (hist) ‎Sliver Spalling ‎[105 bytes]
  371. (hist) ‎Surface Texture ‎[105 bytes]
  372. (hist) ‎Agitating Speed ‎[106 bytes]
  373. (hist) ‎Agitator ‎[106 bytes]
  374. (hist) ‎Sawcutting ‎[106 bytes]
  375. (hist) ‎Angular Aggregate ‎[107 bytes]
  376. (hist) ‎Transverse Reinforcement ‎[107 bytes]
  377. (hist) ‎Type I and Type IA Cement ‎[107 bytes]
  378. (hist) ‎Bulk Density ‎[108 bytes]
  379. (hist) ‎Reconstruction ‎[108 bytes]
  380. (hist) ‎Tamping ‎[108 bytes]
  381. (hist) ‎Edge Form ‎[109 bytes]
  382. (hist) ‎Form Oil ‎[109 bytes]
  383. (hist) ‎Plant-Mixed Concrete ‎[109 bytes]
  384. (hist) ‎Post-Tensioning ‎[109 bytes]
  385. (hist) ‎Adhesion ‎[110 bytes]
  386. (hist) ‎Bond Breaker (Between Slabs) ‎[110 bytes]
  387. (hist) ‎Bulking ‎[110 bytes]
  388. (hist) ‎Cold Joint ‎[110 bytes]
  389. (hist) ‎Cold Weather ‎[110 bytes]
  390. (hist) ‎Continuous Grading ‎[110 bytes]
  391. (hist) ‎Incentive ‎[110 bytes]
  392. (hist) ‎Subbase Friction ‎[110 bytes]
  393. (hist) ‎American National Standards Institute (ANSI) ‎[111 bytes]
  394. (hist) ‎Central-Mixed Concrete ‎[111 bytes]
  395. (hist) ‎Maximum Size Aggregate ‎[111 bytes]
  396. (hist) ‎Sawed Joint ‎[111 bytes]
  397. (hist) ‎Slope ‎[111 bytes]
  398. (hist) ‎Coefficient of Thermal Expansion and Contraction (CTE) ‎[112 bytes]
  399. (hist) ‎Edger ‎[112 bytes]
  400. (hist) ‎Joint Sealant ‎[112 bytes]
  401. (hist) ‎Macrocrack ‎[112 bytes]
  402. (hist) ‎Moisture-Free ‎[112 bytes]
  403. (hist) ‎Over-Sanded ‎[112 bytes]
  404. (hist) ‎Petrology ‎[112 bytes]
  405. (hist) ‎Ribbon Loading ‎[112 bytes]
  406. (hist) ‎Rotary Float (Power Float) ‎[112 bytes]
  407. (hist) ‎Troweling ‎[112 bytes]
  408. (hist) ‎Batched Water ‎[113 bytes]
  409. (hist) ‎Chloride Content ‎[113 bytes]
  410. (hist) ‎Coarse Aggregate ‎[113 bytes]
  411. (hist) ‎Dunagan Analysis ‎[113 bytes]
  412. (hist) ‎Durability Cracking (D-Cracking) ‎[113 bytes]
  413. (hist) ‎Elasticity ‎[113 bytes]
  414. (hist) ‎Secondary Sawing ‎[113 bytes]
  415. (hist) ‎Virgin Material ‎[113 bytes]
  416. (hist) ‎Well-Graded Aggregate ‎[113 bytes]
  417. (hist) ‎Pozzolan-Cement Grout ‎[114 bytes]
  418. (hist) ‎Re-Entrant Corner ‎[114 bytes]
  419. (hist) ‎Recycling ‎[114 bytes]
  420. (hist) ‎Subgrade ‎[114 bytes]
  421. (hist) ‎Benkelman Beam ‎[115 bytes]
  422. (hist) ‎Burn ‎[115 bytes]
  423. (hist) ‎Joint Filler ‎[115 bytes]
  424. (hist) ‎Type III and Type IIIA Cement ‎[115 bytes]
  425. (hist) ‎Vibratory Plate Compactor ‎[115 bytes]
  426. (hist) ‎Bulk Cement ‎[116 bytes]
  427. (hist) ‎Epoxy Injection ‎[116 bytes]
  428. (hist) ‎Kelly Ball ‎[116 bytes]
  429. (hist) ‎Moisture Content of Aggregate ‎[116 bytes]
  430. (hist) ‎Sieve Correction ‎[116 bytes]
  431. (hist) ‎Compression Spalling ‎[117 bytes]
  432. (hist) ‎High-Pressure Water Blasting ‎[117 bytes]
  433. (hist) ‎Surface Spalling ‎[117 bytes]
  434. (hist) ‎Thixotropy ‎[117 bytes]
  435. (hist) ‎Vibration Limit ‎[117 bytes]
  436. (hist) ‎Contact Pressure ‎[118 bytes]
  437. (hist) ‎Materials-Related Distress ‎[118 bytes]
  438. (hist) ‎Slab Stabilization ‎[118 bytes]
  439. (hist) ‎Static Crack ‎[118 bytes]
  440. (hist) ‎Bleed Water ‎[119 bytes]
  441. (hist) ‎Hot-poured Sealant ‎[119 bytes]
  442. (hist) ‎Mixture ‎[119 bytes]
  443. (hist) ‎Polyethylene ‎[119 bytes]
  444. (hist) ‎Water Blast ‎[119 bytes]
  445. (hist) ‎Dowel Lubricant ‎[120 bytes]
  446. (hist) ‎Hairpin ‎[120 bytes]
  447. (hist) ‎Mixer ‎[120 bytes]
  448. (hist) ‎Percentage of Reinforcement ‎[120 bytes]
  449. (hist) ‎Pitch-In ‎[120 bytes]
  450. (hist) ‎Pitch-Out ‎[120 bytes]
  451. (hist) ‎Wash Water ‎[120 bytes]
  452. (hist) ‎Checking ‎[121 bytes]
  453. (hist) ‎Marbleize ‎[121 bytes]
  454. (hist) ‎Plasticity ‎[121 bytes]
  455. (hist) ‎Reinforcement Ratio ‎[121 bytes]
  456. (hist) ‎Density ‎[122 bytes]
  457. (hist) ‎Ettringite ‎[122 bytes]
  458. (hist) ‎Inelastic Deformation ‎[122 bytes]
  459. (hist) ‎Reflection Cracking ‎[122 bytes]
  460. (hist) ‎Rigid Pavement ‎[122 bytes]
  461. (hist) ‎Swelling ‎[123 bytes]
  462. (hist) ‎Lift ‎[124 bytes]
  463. (hist) ‎Slip ‎[124 bytes]
  464. (hist) ‎Sulfate Resistance ‎[124 bytes]
  465. (hist) ‎Beam Test ‎[125 bytes]
  466. (hist) ‎Calcined Clay ‎[125 bytes]
  467. (hist) ‎Early Stiffening ‎[125 bytes]
  468. (hist) ‎Reactive-Powder Concrete ‎[125 bytes]
  469. (hist) ‎Straightedge ‎[125 bytes]
  470. (hist) ‎Subcontractor ‎[125 bytes]
  471. (hist) ‎Thermal Movement ‎[125 bytes]
  472. (hist) ‎Agitation ‎[126 bytes]
  473. (hist) ‎Cover ‎[126 bytes]
  474. (hist) ‎Degree-Hour ‎[126 bytes]
  475. (hist) ‎Extension Chute ‎[126 bytes]
  476. (hist) ‎Plain Bar ‎[126 bytes]
  477. (hist) ‎Precast Concrete ‎[126 bytes]
  478. (hist) ‎Reclaimed Asphalt Pavement (RAP) ‎[126 bytes]
  479. (hist) ‎Deformed Bar ‎[127 bytes]
  480. (hist) ‎Evaporation Retarder ‎[127 bytes]
  481. (hist) ‎Face Forms ‎[127 bytes]
  482. (hist) ‎Reinforcing Mesh ‎[127 bytes]
  483. (hist) ‎Shrinkage ‎[127 bytes]
  484. (hist) ‎Tendon ‎[127 bytes]
  485. (hist) ‎Terminal Joint ‎[127 bytes]
  486. (hist) ‎Adhesives ‎[128 bytes]
  487. (hist) ‎Asphalt Isolation Joint ‎[128 bytes]
  488. (hist) ‎Durability ‎[128 bytes]
  489. (hist) ‎Fat Clay ‎[128 bytes]
  490. (hist) ‎Harshness ‎[128 bytes]
  491. (hist) ‎Moist Air Curing ‎[128 bytes]
  492. (hist) ‎Sealing ‎[128 bytes]
  493. (hist) ‎Transverse Broom ‎[128 bytes]
  494. (hist) ‎Volume Change ‎[128 bytes]
  495. (hist) ‎American Concrete Institute (ACI) ‎[129 bytes]
  496. (hist) ‎Transfer Length ‎[129 bytes]
  497. (hist) ‎Dampproofing ‎[130 bytes]
  498. (hist) ‎Degree of Saturation ‎[130 bytes]
  499. (hist) ‎Density Control ‎[130 bytes]
  500. (hist) ‎Initial Setting Time ‎[130 bytes]

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)